Update on boiler overhaul 28/02/2015

Work is continuing on the boiler overhaul at LNWR Heritage Crewe.

The 21 superheater elements and the flue tubes have been removed and work has started on removing the handrails etc so that the boiler cladding and lagging can be removed prior to the boiler lift.