Boiler Overhaul 18/05/15

thumb_IMG_2665_1024

Work is continuing on the boiler overhaul at Crewe.

The boiler has been turned on its side so that the old crown stays can be removed.

The photo shows the crown stays on the copper side of the firebox being burnt out. The stays will then be burnt out on the top of the firebox. Once they have been removed measurements can be taken for new set of crown stays to be manufactured.

The next job is to remove the foundation ring so that any repairs needed to it can be carried out.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s